|
Mar. 4, 2004 –
Apr. 20, 2004 –
Jul. 15, 2004 –
Jul. 25, 2004 –
Apr. 3, 2005 –
May 2, 2005 –
Jul. 13, 2005 –
|
21st Century Tech Int. makes a strategic alliance with Ingersoll Rand
21st Century Tech of Hawaii Office opens
21st Century Tech of Nevada opens in Las Vegas.
21st Century Tech of Nevada helps the Las Vegas Water District by repairing the solar system at the Springs Preserve.
21st Century Tech of Nevada completes a 30 Kilowatt solar system on the Bank of America call in center in Las Vegas.
21st Century Tech of Nevada completes a 12 Kilowatt solar system at the Nevada Power Pearson building in Las Vegas.
21st Century Tech of Nevada is contracted to maintain the Nevada Power solar system in southern Nevada. |